Irish Ferries Fleet movements

Started by Collision-course, January 05, 2010, 02:52:47 PM

Previous topic - Next topic

scomac

#2625
Quote from: IFPete on January 16, 2026, 11:08:27 AMJames Joyce will be on its way back from Cherbourg then according from Booking engine. Shes out of service from 1430 on 18th until 1830 on the 1st February when she sails from Dublin to Cherbourg,

I'm only going by what the Belfast Harbour booking system says. It has now been updated to show arrival at H&W late on Sunday night.

ferryfan

Inishmore not operating due to "operational reasons" she seems to be very delayed in Dunkirk having arrived for dry docking on the 19th Januar

IFPete

She might be joined by Isle or Inisheer tomorrow,

A83

Isle of Inisheer has been a while in Dunkirk. Is she having major works carried out? When [and where] will she return to service?

IFPete

She is having a new fire supression system installed. She is due back next week from Cherbourg to Dublin.

ferryfan

Preliminary Statement of Results for 2025  show an increases in overall profits a decrease in fuel costs and confirm that the bareboat charter of the Oscar Wilde will end with the complete purchase of the vessel in May 2026
full report here
https://otp.tools.investis.com/clients/uk/icg2/rns1/regulatory-story.aspx?cid=500&newsid=2038432

Futureskipper

Ulysses is using T5 in Holyhead due to the ongoing technical issue with the Stena Adventurer.

giftgrub

A very interesting trip report from the Inisheer on a Dublin Holyhead crossing, well worth a watch

https://youtu.be/Y-VgjoiUbmE?si=yD4MrrXcUxQroBqA

(Filmed before its recent drydock where it has emerged with a new look)

Scroll to the end of this link, images dated March 9th

https://www.doverferryphotosforums.co.uk/mv-isle-of-inisheer-past-and-present/

ferryfan


antster1983

Looking at the schedules on the Irish Ferries, the Dublin Swift is due to start sailing for the summer on Saturday 11th July. Good job too, we're supposed to be on it on the 21st!

Kieran

Quote from: antster1983 on May 26, 2026, 11:44:32 AMLooking at the schedules on the Irish Ferries, the Dublin Swift is due to start sailing for the summer on Saturday 11th July. Good job too, we're supposed to be on it on the 21st!
Just got a message today my sailing in late July on the Swift is moved to the Ulysses "due to berth and operational constraints at Holyhead port"

IFPete

No Plan B for Holyhead. Maybe the labour party will nationise it.

antster1983

#2637
Quote from: Kieran on June 02, 2026, 10:04:00 PMJust got a message today my sailing in late July on the Swift is moved to the Ulysses "due to berth and operational constraints at Holyhead port"

The Swift's disappeared from the booking schedules as well, so it looks like it'll be laid up in Barrow for the forseeable, and we'll probably get bumped onto Ulysses as well.

I don't really mind as I quite liked Ulysses when we got bumped onto there back in May 2022 on a late night Dublin-Holyhead crossing, but Mum ain't gonna be happy - the only reason we book the Swift is because it's a fast crossing as she doesn't have sea legs!

EDIT: We've had messages today confirming that both crossings on the Swift have been cancelled, so we're now going on the James Joyce from Holyhead on the morning sailing on 21st July, and the Ulysses from Dublin on the evening sailing on 4th August. We would have had to alter our booking anyway because we're getting a new car this Tuesday.

Oh well, at least breakfast will be at a slightly more appropriate time, and I won't be limited to scrambled eggs with my full Irish. Every cloud and all that.